The concrete has been poured into the garage blocks, water proof membranes put on the back, drainage installed and drainage metal compacted on top. These shots show the current state of affairs, the main visual change being that the blockwork has started going up on the first level. The digger is backfilling behind the garage blocks.
No comments:
Post a Comment